Annual Chhukha drupchen

Chhukha Hydropower Plant conducted the annual Chhukha drupchen and Vajra Guru dungdrup which was organised from April 23 till May 5, 2019.

The 13-day drupchen was conducted with prayers for good health and long life of His Majesty The King, Royal family of Bhutan, and for the wellbeing of all sentient beings.

© Druk Green Power Corporation Limited | 2019 — All rights reserved