Druk Green Consultancy

  1. Topography surveys & mapping for small areas
  2. Deformation survey to see settlement and movement
  3. Geological mapping, Planning & Investigation
  4. Interpretation of the Investigation results
  5. Preparation of geological sections
  6. Water availability Study for Power Potential Studies
  7. Sedimentation Studies and Power Potential Studies
  8. E-Flow estimation and assessment
  9. Structural design of dam, E&M equipment and H&M equipment
  10. Underground design
  11. Initial ESIA at PFS level
  12. Monitoring of parameter such as air, water and noise
  13. CDM assessment (project Idea Note)
  14. E-Flow Capacity building in cumulative impact assessment

Project Capabilities

Projects completed

 

2015 – 201 Detailed Project Study of 442 (125 + 317) MW Nyera Amari I & II Integrated Hydroelectric Projects
2017 Detailed Project Study of 26 MW (18 + 8) Druk Bindu Stage 2 Small Hydroelectric Projects
2016 Detailed Project Study of 26 MW (18 + 8) Druk Bindu Stage 1 Small Hydroelectric Projects
2014 Pre-Feasibility Study of 442 MW (125 + 317) Nyera Amari I & II Integrated Hydroelectric Projects
Pre-Feasibility Study of 130 MW (45 + 85) Gamri Hydroelectric Project
Pre-Feasibility Study Aeichhu Hydro Project
2009 – 2013 Pre-Feasibility Study and Feasibility/Detailed Project Study for 118 MW Nikachhu Hydroelectric Project
2012 Feasibility Study and detailed design for Tsibjalumchhu Diversion Scheme
2011 Pre-Feasibility Study of 1,125 Dorjilung (formerly Kuri-I) Hydroelectric Project
2010 Reconnaissance Study of 130 MW (45 + 85) Gamri Hydroelectric Projects
© Druk Green Power Corporation Limited | 2019 — All rights reserved