MoU with WAPCOS

A memorandum of understanding was signed between DGPC and WAPCOS Limited for carrying out balance infrastructural works including architectural works of Punatsangchhu Hydroelectric Project I on October 7, 2019.

As per the MoU, DGPC will carry out consultancy works pertaining to machine hall cavern, transformer hall cavern, utility buildings inside powerhouse complex, portals for various tunnels, pothead yard building, control room building at tail race tunnel and blower room buildings at powerhouse, DSSG and butterfly valve chamber.

© Druk Green Power Corporation Limited | 2019 — All rights reserved