   Installed capacity
   Design energy
   Project cost
   Incorporation
   Project schedule
   Shareholder

: 2 X 59 MW
: 491.52 MU
: Nu. 11.96 billion
: April 25, 2014
: April 2016 – 2023
: DGPC (100%)

THyE_Excavation of left bank at dam site