The bid for “Carrying out Exploratory Drift on the right bank of Gongri
Hydropower Project (Package-I) and Carrying out Exploratory Drift on the left bank of Gongri Hydropower Project (Package-II)” has been extended till July 7, 2023.
The bid for “Carrying out Exploratory Drift on the right bank of Gongri
Hydropower Project (Package-I) and Carrying out Exploratory Drift on the left bank of Gongri Hydropower Project (Package-II)” has been extended till July 7, 2023.